iphonedanax.blogg.se

Pipenet and pipeflo
Pipenet and pipeflo




SCOPE: Detail engineering of Piping & Supports Using PDMS and Stress calculation using Rohr2 Plant in Brief Key Facts PE-ARISTI Solution: PE-ARISTI Expertise in advanced design tools like Pipenet and Caesar helped in both surge Analysis and stress analysis to achieve the optimum solution without any additional surge protection devices and less anchor supportsĬASE: Tanda Thermal Power Plant Stage II unit 5 & 6ĬLIENT: Alstom Bharat Forge Power Limited PE-ARISTI worked on the Surge & Stress analysis for Treated, potable, sewage and Fire Water using Pipe net and Caesar II softwareĬhallenge: Optimizing Anchor Blocks in the pipeline and Identifying the Surge pressures for various scenarios in the pipeline are the major challenges. The Utility Corridor comprises of interconnecting piping between various facilities/buildings and instrumentation cables from various facilities / buildings to the Gas Processing Plant (GPP). Oman Oil Company Exploration and production (OOCEP) are developing the Abu Tubul gas and associated condensate field in Block-60, located about 100 km west of the existing central Oman gas/condensate producing fields. Surge & Stress analysis for Treated water system, Potable Water, Sewage and Fire Water systemĮPC Contractor: Gulf Petrochemical Services & Trading LLC and Valdel for engineering consultantĮnd User: Oman Oil Company Exploration & Production LLC Project Description SCOPE: Engineering Services for Surge & Stress Analysis Plant in Brief Key Facts We also provided a dedicated coordinating team located closer to client in Saudi Arabia to coordinate on day to day basis and to do the fast track implementation due to the changes from Saudi Consultant.ĬASE: Abu Tubul Block-60 _ Central Facilities Civils Utility Corridor PE-ARISTI Solution: We provided highly experienced Engineering Team to focus and understand on the new technology which will help to implement the needed detail design. PE-ARISTI works on the complete scope of detail Engineering for WWTP including Mechanical, Piping, Civil & Structural, Electrical, Instrumentation, Fire Fighting and HVAC.Ĭhallenge: New advanced technology of Membrane Bio Reactor, Coordinating with Japanese Client from India and Approvals from Saudi Consultants are challenges for PE-ARISTI. The process of WWTP is divided in to three Streams each one with 5,000 m3/day, Civil Design is done for entire 15,000 m3/day, but electro mechanical design is for one stream 5000 m3/day. MODON is developing Industrial City in Riyadh which involves developing a waste water treatment plant of Capacity 15,000 m3/day using advanced technology of Membrane Bio-Reactor. Location: Saudi Arabia, Riyadh, Industrial Waste Water TreatmentĮnd User: National Water Company Project Description SCOPE: Multi-Disciplinary Engineering Services for Phase 1 Plant in Brief Key FactsĬivil design is Performed for 15000 m3/Day PE-ARISTI Solution: PE-ARISTI Team is well experienced in Saudi Aramco way of working and Standard helped to obtain the approvals.ĬASE: Waste Water Treatment Plant of 5000 m3/day Plumbing: Sanitary, Potable and Drinking Water Layout with MTOĮlectrical: Load Schedule, Overall Lighting, Earthing layout and overall cable Schedule from individual DB to Main Distribution Board.įire Fighting system: Fire Hydrant system for above mention facilities with hydraulic calculation and Civil work include all foundation &temporary sheltersĬhallenge: Saudi Aramco approval for the design document is the biggest challenge PE-ARISTI works on the complete scope of detail engineering for Accommodation facilities for both contractor and NSH Employee, office facilities and warehouse facilities which including complete design The gas plant is a notable part of Saudi Arabia's proposed Master Gas System that has been planned to fulfil the increasing energy demand in the country by expanding the kingdom's sales gas capacity from 9.3bcf/d in 2015 to 12.2bcf/d in 2021. The Fadhili gas plant is a Greenfield development to be constructed 30km west of Jubail in Saudi Arabia's eastern province. Location: Saudi Arabia, Fadhili Gas Plant, Jubail, Saudi ArabiaĮnd User: Saudi Aramco Project Description Temporary Camp Facilities: Total Capacity for Office Area -1 38235 m2, Office Area-2 45076 m2 & Warehouse Area 27121 m2 SCOPE: Multi-Disciplinary Engineering Services Plant in Brief Key FactsĬontractor Accommodation: Total plot area 318780 m2 with occupancy 8850 people CASE: Temporary Camp Facilities for Office, Staff Accommodation and Ware house for Aramco Personnel’s Area at Fadhili gas plant SRU Package -3






Pipenet and pipeflo